Boeing 777-200 and -300 operators have been ordered by the US Federal Aviation Administration to inspect back-up generators and replace any found with sheared shafts within 14 days. The AD follows two in-flight engine shut downs caused by variable frequency constant speed system problems.

Source: Flight International