Final assembly of the first Airbus A380 flight-test aircraft (MSN001) progressed to "power-on" stage on 30 July, with the aircraft's electrical generation and distribution systems being powered up for the first time. The tests will evaluate the performance of its four power generators.
Source: Flight International