All articles by Jon Ostrower – Page 3
-
News
Boeing expects delamination issue to slow 787 deliveries in the near term
Boeing expects the inspection and repair of 787s affected by composite delamination due to improper longeron shimming to slow near-term deliveries, but is unlikely to change its full year delivery forecast.
-
News
Delamination prompts Boeing to inspect 787 fleet
Boeing again faces a manufacturing quality issue, requiring inspections and repairs of its 787 fleet. Structural stiffeners were found to be improperly...
-
News
First 747-8I for delivery completes maiden sortie
Boeing on 30 January completed the maiden flight of its first 747-8 Intercontinental, which is destined for a private Boeing Business Jet customer.
-
News
Aviation Partners seeks dismissal of Airbus winglet lawsuit
Seattle-based Aviation Partners (API), patent-holder of the blended winglet, is seeking the dismissal of an Airbus lawsuit aiming to clarify the intellectual property rights of the European airframer's alleged use of API's winglet on the Airbus A320's sharklets.
-
News
GE flies second upgrade package for 787 engine
General Electric is progressing through certification of its performance improvement package (PIP) upgrades for the GEnx-1B and -2B engines for the 787 and...
-
News
ANA faces bumpy start to long-haul 787 service
All Nippon Airways first long-haul international service with its Boeing 787 has faced a rocky start since 21 January with two of its ten flights operating...
-
News
Boeing eyes production ramp for development programmes
Boeing expects to deliver 35 to 42 787s in 2012 and a similar number of 747-8s as part of its new development programme forecast of 70 to 85 deliveries.
-
News
Boeing expects no 787 rework on mid-60s line number
Boeing will build a factory complete 787 that requires no post-assembly rework during mid-year, the company confirmed.
-
News
Boeing beats Wall Street earning targets in Q4
Boeing blasted past Wall Street projections in the fourth quarter on strong earnings performance from its military aircraft division and improved margins...
-
News
737 Max development cost to be twice A320neo: report
With a greater level of structural modification required to accommodate new CFM International Leap-1B engines, Boeing's cost to develop the re-engined 737...
-
News
PrivatAir signs for up to 10 CS100s
Bombardier has received a firm order for up to 10 CSeries CS100 aircraft from PrivatAir, which will be delivered in an all-business class configuration. The...
-
News
Boeing locks out 747-8 tail fuel tanks on flutter concerns
In order to meet certification requirements ahead of its first delivery, Boeing will lock out the 12,500l (3,300gal) horizontal stabiliser tail fuel tanks...
-
News
Boeing increases 747-8 family weights
Boeing has increased the maximum takeoff weight (MTOW) of its 747-8 Intercontinental and 747-8 freighter after its flight loads survey revealed additional...
-
News
787 achieves 96.3% dispatch reliability
After two and a half months of scheduled service, All Nippon Airways' (ANA) Boeing 787 fleet has achieved a dispatch reliability of 96.3% as it plans to expand Japanese domestic operations and begin its first scheduled international routes.
-
News
Air India 787 RFP confirms low prices but raises questions on deliveries
The public posting of a sale and leaseback request for proposal (RFP) by Air India has provided a glimpse of the carrier's transaction for its Boeing 787s. It confirms the low prices the backlog was built on and raises questions about the timing of its deliveries.
-
News
Unidentified customer orders 10 Boeing 787s
Boeing has added 28 new aircraft to its backlog, including 10 787s from an unidentified customer.
-
News
RFP details Air India 787 pricing and configuration
Air India has detailed the technical and financial specifications of its first seven Boeing 787s, including prices the Indian flag carrier will pay for its...
-
News
Bombardier begins CSeries Aircraft 0 activation
Seeking to significantly de-risk its already squeezed CSeries aircraft program, Bombardier has begun commissioning and activating systems on Aircraft 0, its iron bird systems validator part of its complete integrated aircraft systems test area (CIASTA) at its Mirabel, Quebec facility outside of Montreal.
-
News
Bombardier to deliver 10 CSeries per month in 2016
Having accumulated over 300 orders and commitments for CSeries CS100 and CS300 aircraft, Bombardier says it is now sold out of delivery slots in 2014 and...
-
News
Bombardier details CSeries flight test programme
With the first flight of its CSeries CS100 pencilled in for the end of 2012, Bombardier has for the first time detailed its flight test programme that will certify and deliver the first 125-seat jet by the end of 2013.